Home
Support Contact
TürkçeEnglishDeutschFrançaisРусскийالعربية

WhatsApp: +90 850 346 55 49 · info@netsystem.com.tr

Manufacturing & Operations

Monitor Your Shop Floor in Real Time

Bring machine, operator and work order data together on a single dashboard. See OEE, downtime and scrap in real time, and run production on data, not guesswork.

Who is it for? Metalworking, plastic injection molding, automotive suppliers, machinery manufacturing, and food and packaging producers.

MESLine Dashboard · Shift ALive
OEE82,4%▲ 3,1 pts vs yesterday
Produced1.284target 1.500 · 86%
Downtime38 min3 events · 1 open
Scrap1,2%15 pcs
CNC-01Running
İE-4471 · Flange Ø80
Cycle 42 s186/240 pcs
CNC-02Running
İE-4472 · Shaft 25 mm
Cycle 38 s154/240 pcs
PRES-03Down
Die change · 12 min
Cycle 92/300 pcs
KAYNAK-04Running
İE-4468 · Chassis bracket
Cycle 72 s73/80 pcs
BOYA-05Setup
Color change · RAL 7016
Cycle 10/120 pcs
MONTAJ-06Running
İE-4465 · Pump assembly
Cycle 160 s44/80 pcs
The Status Quo

Do These Problems Sound Familiar?

The four most common problems we see in the field, and how we solve them.

Data arrives on paper at the end of the shift

Output counts, downtime and scrap are written down by hand at the end of each shift, so the real picture isn't visible until the day is over.

No one knows why machines stop

A machine stops, but the reason never gets recorded. A breakdown? Material? Setup? Improvements are based on guesswork.

OEE can't be calculated

Equipment effectiveness isn't measured, so investment and capacity decisions are made on gut feeling.

No traceability

No one knows which lot was produced on which machine by which operator, so complaints can't be traced back.

Our Approach

How We Solve These Problems

Our MES solution closes the gap between your shop floor and your office. Signals from machines and data entered at operator terminals flow instantly to a central dashboard. You can see live which machine each work order is running on, at what speed, how long it has been stopped and how much scrap it has produced. OEE is calculated automatically; downtime reasons are coded, and Pareto analysis reveals your biggest source of losses.

Scope

The Building Blocks of the Solution

The modules of our MES · Production Tracking solution, configured with you to fit your needs.

01

Machine Data Collection

Run time, downtime and part counts are collected automatically from PLC, sensor and counter signals.

02

Operator Terminal

Start and finish jobs and report downtime by barcode from a tablet or touchscreen.

03

OEE Analysis

Real-time OEE calculated from its availability, performance and quality components.

04

Downtime Management

Coded downtime reasons, instant notifications and downtime duration tracking.

05

Work Order Tracking

Progress of work orders from the ERP, machine by machine.

06

Scrap & Quality Records

Scrap quantities and reasons, plus recorded quality control results.

07

Lot Traceability

Full traceability by lot and batch, from raw material to finished product.

08

Shifts & Staff

Performance compared by shift, operator and machine.

09

Live Production Board

Line status and target tracking on shop-floor displays (andon).

How We Work

From Discovery to Go-Live in 4 Steps

What gets delivered at the end of each step is clear from the start — no surprises.

Discovery & line analysis

Together on the shop floor, we identify the machines, the workflow and the data points to collect.

Data connection

Machine signals are connected, operator terminals are installed and work orders are imported from the ERP.

Pilot line

The system goes live on a selected line; operators are trained and the data is validated.

Rollout

It's rolled out to all lines, and OEE targets and a continuous improvement cycle are put in place.

Integrations

Works Seamlessly with Your Existing Systems

We build on top of the software you already use — no replacement required.

Logo product familyNetsisPLC / OPC UAModbusIoT sensorsBarcode & RFIDMRP moduleAndon displays
Reporting & Data

Make Decisions Backed by Data

Decision dashboards that give managers hard numbers, not guesses.

OEE trend

OEE and its components over time, by machine, line and shift.

Downtime Pareto analysis

The downtime reasons that cost the most time, ranked by frequency and duration.

Shift comparison

Differences in output, scrap and efficiency between shifts and operators.

Let's Discuss Your Project

Tell us about your production tracking (MES) needs, and we'll map out a roadmap tailored to you. The discovery call is free.